HS Direct Ltd has written some example method statements and risk assessments specifically for the building and construction industry.
The list below allows you to purchase your health & safety documentation for tasks relevant to you. We know this is a long list,
so call us on 0800 849 6728 and we will ensure you get the correct product for your task. All our method
statements and risk assessments included things such as site safety, lifting equipment and working at height where appropriate.
All our documents are delivered instantly through email and on your screen after you have paid. They come in microsoft word format,
but don't worry if you do not have word, you can download a free alternative by clicking here
or by contacting us on 0800 849 6728. All prices quoted are exclusive of VAT
| Air Conditioning Installation Method Statement |  |  |  | £13.99 |
| Aluminium Partitioning Method Statement |  |  |  | £13.99 |
| Aluminium Tower Scaffold Erection Method Statement |  |  |  | £13.99 |
| Asbestos Removal Method Statement |  |  |  | £13.99 |
| Bathroom Re-fitting Method Statement |  |  |  | £13.99 |
| Blank Method Statement |  |  |  | £13.99 |
| Brick & Blockwork Method Statement |  |  |  | £13.99 |
| Brick & Stone Cleaning Method Statement |  |  |  | £13.99 |
| Brick Cleaning and Pointing Method Statement |  |  |  | £13.99 |
| Brio Flooring Method Statement |  |  |  | £13.99 |
| Builders Clean Method Statement |  |  |  | £13.99 |
| Carpet Cleaning Method Statement |  |  |  | £13.99 |
| CCTV Installation Method Statement |  |  |  | £13.99 |
| Central Heating Installation Method Statement |  |  |  | £13.99 |
| Cleaning Method Statement |  |  |  | £13.99 |
| Demolition (Non Load Bearing Wall) Method Statement |  |  |  | £13.99 |
| Double Glazing Installation Method Statement |  |  |  | £13.99 |
| Drain Cleaning Method Statement |  |  |  | £13.99 |
| Electrical (Move Main Board) Method Statement |  |  |  | £13.99 |
| Electrical Conduit Installation Method Statement |  |  |  | £13.99 |
| Electrical First Fix Method Statement |  |  |  | £13.99 |
| Electrical Method Statement |  |  |  | £13.99 |
| Emergency Lighting Method Statement |  |  |  | £13.99 |
| Excavator use Method Statement |  |  |  | £13.99 |
| Exterior Decorating Method Statement |  |  |  | £13.99 |
| Fire Alarm Fitting Method Statement |  |  |  | £13.99 |
| Fire and Fireplaces Installation Method Statement |  |  |  | £13.99 |
| Floor Screeding Method Statement |  |  |  | £13.99 |
| Flooring Method Statement |  |  |  | £13.99 |
| Forklift Truck Use Method Statement |  |  |  | £13.99 |
| Gas Installations Method Statement |  |  |  | £13.99 |
| General Property Maintenance Method Statement |  |  |  | £19.95 |
| General Roofing Method Statement |  |  |  | £13.99 |
| Ground Works Method Statement |  |  |  | £13.99 |
| Groundworks / Drainage Method Statement |  |  |  | £13.99 |
| Gutter Cleaning Method Statement |  |  |  | £13.99 |
| Hanging Wallpaper Method Statement |  |  |  | £13.99 |
| Heras Fencing Method Statement |  |  |  | £13.99 |
| House Re-Wire Method Statement |  |  |  | £13.99 |
| House Removals Method Statement |  |  |  | £13.99 |
| Interior Decorating Method Statement |  |  |  | £13.99 |
| Joinery (First Fix) Method Statement |  |  |  | £13.99 |
| Joinery (Second Fix) Method Statement |  |  |  | £13.99 |
| Kerbstone Works Method Statement |  |  |  | £13.99 |
| Kitchen Re-fitting Method Statement |  |  |  | £13.99 |
| Laminate Flooring Method Statement |  |  |  | £13.99 |
| Leadworks to Roof Method Statement |  |  |  | £13.99 |
| Machinery Servicing Method Statement |  |  |  | £13.99 |
| Mastic Sealing Windows Method Statement |  |  |  | £13.99 |
| Office Removals Method Statement |  |  |  | £13.99 |
| Office Strip Out Method Statement |  |  |  | £13.99 |
| Partitioning and Drylining Method Statement |  |  |  | £13.99 |
| PAT Testing Method Statement |  |  |  | £13.99 |
| Perimeter Hoarding Erection (Steel) Method Statement |  |  |  | £13.99 |
| Pitched Roofing Method Statement |  |  |  | £13.99 |
| Plastering Method Statement |  |  |  | £13.99 |
| Plumbing Method Statement |  |  |  | £13.99 |
| Plywood Floor Method Statement |  |  |  | £13.99 |
| Pre-Fabricated Building Installation Method Statement |  |  |  | £13.99 |
| Resilient Flooring Method Statement |  |  |  | £13.99 |
| Road Surfacing Method Statement |  |  |  | £13.99 |
| Safety Flooring Method Statement |  |  |  | £13.99 |
| Scaffolding Method Statement |  |  |  | £13.99 |
| Sheet Vinyl Laying Method Statement |  |  |  | £13.99 |
| Skips Method Statement |  |  |  | £13.99 |
| Sliding Electric Gates Installation Method Statement |  |  |  | £13.99 |
| Soffit Fascia Method Statement |  |  |  | £13.99 |
| Special Carpeting Method Statement |  |  |  | £13.99 |
| Stock Fencing Method Statement |  |  |  | £13.99 |
| Suspended Ceiling Installation Method Statement |  |  |  | £13.99 |
| Taping and Jointing Method Statement |  |  |  | £13.99 |
| Tiling Method Statement |  |  |  | £13.99 |
| Tiling/Slating Pitched Roof Method Statement |  |  |  | £13.99 |
| Timber Hoarding Erection Method Statement |  |  |  | £13.99 |
| Traditional Carpeting Method Statement |  |  |  | £13.99 |
| Underpinning Method Statement |  |  |  | £13.99 |
| Wood Floor Method Statement |  |  |  | £13.99 |
| Woodwork / Carpentry Method Statement |  |  |  | £13.99 |
| Air Compressor |  |  |  | £13.99 |
| Air Conditioning Installation Risk Assessment |  |  |  | £13.99 |
| Aluminium Tower Scaffold Erection Risk Assessment |  |  |  | £13.99 |
| Asbestos Removal Risk Assessment |  |  |  | £13.99 |
| Beam Saw Machinery Installation Risk Assessment |  |  |  | £13.99 |
| Blank Risk Assessment Template |  |  |  | £13.99 |
| Brick & Blockwork Risk Assessment |  |  |  | £13.99 |
| Brick Cleaning and Pointing Risk Assessment |  |  |  | £13.99 |
| Brio Flooring Risk Assessment |  |  |  | £13.99 |
| Carpet Cleaning Risk Assessment |  |  |  | £13.99 |
| CCTV Installation Risk Assessment |  |  |  | £13.99 |
| Central Heating Installation Risk Assessment |  |  |  | £13.99 |
| Cleaning Risk Assessment |  |  |  | £13.99 |
| Demolition (Non Load Bearing Wall) Risk Assessment |  |  |  | £13.99 |
| Double Glazing Installation Risk Assessment |  |  |  | £13.99 |
| Electrical Fitting Risk Assessment |  |  |  | £13.99 |
| Excavator use Risk Assessment |  |  |  | £13.99 |
| Exterior Decorating Risk Assessment |  |  |  | £13.99 |
| Flat Roofing Replacement Risk Assessment |  |  |  | £13.99 |
| Floor Screeding Risk Assessment |  |  |  | £13.99 |
| Flooring Risk Assessment |  |  |  | £13.99 |
| Forklift Truck Risk Assessment |  |  |  | £13.99 |
| General Property Maintenance Risk Assessment |  |  |  | £19.95 |
| General Roofing Works Risk Assessment |  |  |  | £13.99 |
| Ground Works Risk Assessment |  |  |  | £13.99 |
| House Removals Risk Assessment |  |  |  | £13.99 |
| Interior Decoration Risk Assessment |  |  |  | £13.99 |
| Kitchen and Bathroom Refitting Risk Assessment |  |  |  | £13.99 |
| Laminate Flooring Risk Assessment |  |  |  | £13.99 |
| Machinery Service and Repair Risk Assessment |  |  |  | £13.99 |
| Office Removals Risk Assessment |  |  |  | £13.99 |
| Partitioning and Drylining Risk Assessment |  |  |  | £13.99 |
| Perimeter Hoarding Erection (Steel) Risk Assessment |  |  |  | £13.99 |
| Pitched Roofing Risk Assessment |  |  |  | £13.99 |
| Plastering Risk Assessment |  |  |  | £13.99 |
| Plywood Floor Risk Assessment |  |  |  | £13.99 |
| Rendering (Exterior) Risk Assessment |  |  |  | £13.99 |
| Resilient Flooring Risk Assessment |  |  |  | £13.99 |
| Road Surfacing Risk Assessment |  |  |  | £13.99 |
| Safety Flooring Risk Assessment |  |  |  | £13.99 |
| Screeding Latex Risk Assessment |  |  |  | £13.99 |
| Sheet Vinyl Laying Risk Assessment |  |  |  | £13.99 |
| Sliding Electric Gates Installation Risk Assessment |  |  |  | £13.99 |
| Soffit Fascia Risk Assessment |  |  |  | £13.99 |
| Special Carpeting Risk Assessment |  |  |  | £13.99 |
| Suspended Ceiling Installation Risk Assessment |  |  |  | £13.99 |
| Tiling Risk Assessment |  |  |  | £13.99 |
| Traditional Carpeting Risk Assessment |  |  |  | £13.99 |
| Underpinning Risk Assessment |  |  |  | £13.99 |
| Van Driving Risk Assessment |  |  |  | £13.99 |
| Wood Floor Risk Assessment |  |  |  | £13.99 |
| Woodwork / Carpentry Risk Assessment |  |  |  | £13.99 |
| Working at Height Risk Assessment |  |  |  | £13.99 |
| 114 Latex COSHH |  |  |  | £13.99 |
| 128 Latex COSHH Assessment |  |  |  | £13.99 |
| 538 Bostik COSHH Assessment |  |  |  | £13.99 |
| Altro Floor COSHH Assessment |  |  |  | £13.99 |
| Bal Green Star Tile Adhesive COSHH Assessment |  |  |  | £13.99 |
| Bal Grout COSHH Assessment |  |  |  | £13.99 |
| Bitumen COSHH Assessment |  |  |  | £13.99 |
| Blank COSHH Assessment |  |  |  | £13.99 |
| Brick Dust COSHH Assessment (Silica) |  |  |  | £13.99 |
| Caulk COSHH Assessment |  |  |  | £13.99 |
| Diesel Fuel COSHH Assessment |  |  |  | £13.99 |
| Dry Ice COSHH Assessment |  |  |  | £13.99 |
| Dulux Eggshell COSHH Assessment |  |  |  | £13.99 |
| Dulux High Gloss COSHH Assessment |  |  |  | £13.99 |
| Dulux Quick Dry Eggshell COSHH Assessment |  |  |  | £13.99 |
| Dulux Trade Matt Diamond COSHH Assessment |  |  |  | £13.99 |
| Dulux Trade Satinwood COSHH Assessment |  |  |  | £13.99 |
| Dulux Undercoat COSHH Assessment |  |  |  | £13.99 |
| Dulux Vinyl Matt COSHH Assessment |  |  |  | £13.99 |
| Engine Oil COSHH Assessment |  |  |  | £13.99 |
| Everbuild Mirror Flex COSHH Assessment |  |  |  | £13.99 |
| Everbuild Pink Grip COSHH Assessment |  |  |  | £13.99 |
| F3 Central Heating Cleaner COSHH Assessment |  |  |  | £13.99 |
| FEBMIX COSHH Assessment |  |  |  | £13.99 |
| Fibreglass (Sheets) COSHH Assessment |  |  |  | £13.99 |
| FLOPLAST COSHH Assessment |  |  |  | £13.99 |
| Flux COSHH Assessment |  |  |  | £13.99 |
| Gyproc Building Plasters COSHH Assessment |  |  |  | £13.99 |
| Gyproc Thistle Drycoat COSHH Assessment |  |  |  | £13.99 |
| Hydrated Lime Cement COSHH Assessment |  |  |  | £13.99 |
| Hydrofluoric Acid Assessment |  |  |  | £13.99 |
| Jangro Eco All Purpose Cleaner COSHH Assessment |  |  |  | £13.99 |
| Jangro Eco Daily Toilet Cleaner COSHH Assessment |  |  |  | £13.99 |
| Jangro Eco Degreaser COSHH Assessment |  |  |  | £13.99 |
| Jangro Eco Floor Gel COSHH Assessment |  |  |  | £13.99 |
| Jangro Eco Floor Maintainer COSHH Assessment |  |  |  | £13.99 |
| Jangro Eco Foaming Cleaner COSHH Assessment |  |  |  | £13.99 |
| Jangro Eco Polish COSHH Assessment |  |  |  | £13.99 |
| Jangro Eco Steel Cleaner COSHH Assessment |  |  |  | £13.99 |
| Jangro Eco Washing Up Liquid COSHH Assessment |  |  |  | £13.99 |
| Lead COSHH Assessment |  |  |  | £13.99 |
| Lemon Gel COSHH Assessment |  |  |  | £13.99 |
| Limestone Powder COSHH Assessment |  |  |  | £13.99 |
| LPG COSHH Assessment |  |  |  | £13.99 |
| Mastic COSHH Assessment |  |  |  | £13.99 |
| MDF Dust COSHH Assessment |  |  |  | £13.99 |
| Mr Sheen Furniture Polish COSHH Assessment |  |  |  | £13.99 |
| Murabond Wallpaper Adhesive COSHH Assessment |  |  |  | £13.99 |
| Myland Cellulose Lacquer All Sheens COSHH Assessment |  |  |  | £13.99 |
| Myland Dual Thinners COSHH Assessment |  |  |  | £13.99 |
| Myland French Polish All Types COSHH Assessment |  |  |  | £13.99 |
| Myland New Perfecta Stripper COSHH Assessment |  |  |  | £13.99 |
| No Nonsense Decorators Caul COSHH Assessment |  |  |  | £13.99 |
| No Nonsense Fire Rated Expanding Foam COSHH Assessment |  |  |  | £13.99 |
| No Nonsense Grab Adhesive Solvent Based COSHH Assessment |  |  |  | £13.99 |
| Petrol COSHH Assessment |  |  |  | £13.99 |
| Polyvine Acryllic Varnish COSHH Assessment |  |  |  | £13.99 |
| Portland Cement COSHH Assessment |  |  |  | £13.99 |
| PVA Glue COSHH Assessment |  |  |  | £13.99 |
| Quick Dry Clear Varnish COSHH Assessment |  |  |  | £13.99 |
| Quick Dry Coloured Varnish COSHH Assessment |  |  |  | £13.99 |
| Red Oxide Primer COSHH |  |  |  | £13.99 |
| Roundup Glyphosate COSHH Assessment |  |  |  | £13.99 |
| Silicone Sealant Low Modulus COSHH Assessment |  |  |  | £13.99 |
| Siroflex Expanding Foam COSHH Assessment |  |  |  | £13.99 |
| SOS Aroma Lemon COSHH Assessment |  |  |  | £13.99 |
| Styccobond F44 COSHH Assessment |  |  |  | £13.99 |
| Tarmac COSHH Assessment |  | Added To Cart |  | £13.99 |
| Unibond Waterproof Tile Adhesive COSHH Assessment |  |  |  | £13.99 |
| Wall Shield COSHH Assessment |  |  |  | £13.99 |
| WD40 COSHH Assessment |  |  |  | £13.99 |
| Webertec Pyrapatch COSHH Assessment |  |  |  | £13.99 |
| White Spirit COSHH Assessment |  |  |  | £13.99 |
| Wickes Patching Plaster COSHH Assessment |  |  |  | £13.99 |