Electrical Industry Safety Documents from HS Direct Ltd
HS Direct Ltd has written some example method statements and risk assessments specifically for the Electrical contracting industry. The list below allows you to purchase your health & safety documentation for tasks relevant to you. We know this is a long list, so call us on 0800 849 6728 and we will ensure you get the correct product for your task. All our method statements and risk assessments included things such as site safety, lock off and isolation procedures, and working at height where appropriate.
All our documents are delivered instantly through email and on your screen after you have paid. They come in microsoft word format, but don't worry if you do not have word, you can download a free alternative by clicking here or by contacting us on 0800 849 6728. All prices quoted are exclusive of VAT
Electricians Health & Safety Set
We have created a package for Electricians that includes a Risk Assessment, Method Statements, Health & Safety Policy and toolbox talks for Electrical Contractors. With 11 documents included in the package the price is discounted from our single document prices. Click more info for full details of what is included in the package.
| Just £89.95 |
![]() |
![]() |
![]() |
| Electrical Method Statements - Call 0800 849 6728 for help selecting the correct documents | ||||
| Network Cabling Method Statement | ![]() | ![]() | ![]() | £13.99 |
| Electrical Method Statement | ![]() | ![]() | ![]() | £13.99 |
| Air Conditioning Installation Method Statement | ![]() | ![]() | ![]() | £13.99 |
| Kitchen Re-fitting Method Statement | ![]() | Added To Cart | ![]() | £13.99 |
| Electrical (Move Main Board) Method Statement | ![]() | ![]() | ![]() | £13.99 |
| Aluminium Tower Scaffold Erection Method Statement | ![]() | ![]() | ![]() | £13.99 |
| Wind Turbine Method Statement | ![]() | ![]() | ![]() | £13.99 |
| Solar Roof Panel Method Statement | ![]() | ![]() | ![]() | £13.99 |
| PAT Testing Method Statement | ![]() | ![]() | ![]() | £13.99 |
| Emergency Lighting Method Statement | ![]() | ![]() | ![]() | £13.99 |
| Fire Alarm Fitting Method Statement | ![]() | ![]() | ![]() | £13.99 |
| Ground Source Heat Pump Method Statement | ![]() | ![]() | ![]() | £13.99 |
| PV (PhotoVoltaic) Cells Installation Method Statement | ![]() | ![]() | ![]() | £13.99 |
| Electrical First Fix Method Statement | ![]() | ![]() | ![]() | £13.99 |
| House Re-Wire Method Statement | ![]() | ![]() | ![]() | £13.99 |
| Electrical Conduit Installation Method Statement | ![]() | ![]() | ![]() | £13.99 |
| Sliding Electric Gates Installation Method Statement | ![]() | ![]() | ![]() | £13.99 |
| Asbestos Removal Method Statement | ![]() | ![]() | ![]() | £13.99 |
| Carpet Cleaning Method Statement | ![]() | ![]() | ![]() | £13.99 |
| Brio Flooring Method Statement | ![]() | ![]() | ![]() | £13.99 |
| Laminate Flooring Method Statement | ![]() | ![]() | ![]() | £13.99 |
| Plywood Floor Method Statement | ![]() | ![]() | ![]() | £13.99 |
| Resilient Flooring Method Statement | ![]() | ![]() | ![]() | £13.99 |
| Safety Flooring Method Statement | ![]() | ![]() | ![]() | £13.99 |
| Sheet Vinyl Laying Method Statement | ![]() | ![]() | ![]() | £13.99 |
| Special Carpeting Method Statement | ![]() | ![]() | ![]() | £13.99 |
| Traditional Carpeting Method Statement | ![]() | ![]() | ![]() | £13.99 |
| Wood Floor Method Statement | ![]() | ![]() | ![]() | £13.99 |
| Electricians Risk Assessments - Call 0800 849 6728 for help selecting the correct documents | ||||
| Electrical Fitting Risk Assessment | ![]() | ![]() | ![]() | £13.99 |
| Network Cabling Risk Assessment | ![]() | ![]() | ![]() | £13.99 |
| Air Conditioning Installation Risk Assessment | ![]() | ![]() | ![]() | £13.99 |
| Kitchen and Bathroom Refitting Risk Assessment | ![]() | ![]() | ![]() | £13.99 |
| Aluminium Tower Scaffold Erection Risk Assessment | ![]() | ![]() | ![]() | £13.99 |
| Wind Turbine Risk Assessment | ![]() | ![]() | ![]() | £13.99 |
| Solar Roof Panels Risk Assessment | ![]() | ![]() | ![]() | £13.99 |
| Sliding Electric Gates Installation Risk Assessment | ![]() | ![]() | ![]() | £13.99 |
| Asbestos Removal Risk Assessment | ![]() | ![]() | ![]() | £13.99 |
| Carpet Cleaning Risk Assessment | ![]() | ![]() | ![]() | £13.99 |
| Brio Flooring Risk Assessment | ![]() | ![]() | ![]() | £13.99 |
| Laminate Flooring Risk Assessment | ![]() | ![]() | ![]() | £13.99 |
| Plywood Floor Risk Assessment | ![]() | ![]() | ![]() | £13.99 |
| Resilient Flooring Risk Assessment | ![]() | ![]() | ![]() | £13.99 |
| Safety Flooring Risk Assessment | ![]() | ![]() | ![]() | £13.99 |
| Screeding Latex Risk Assessment | ![]() | ![]() | ![]() | £13.99 |
| Sheet Vinyl Laying Risk Assessment | ![]() | ![]() | ![]() | £13.99 |
| Special Carpeting Risk Assessment | ![]() | ![]() | ![]() | £13.99 |
| Traditional Carpeting Risk Assessment | ![]() | ![]() | ![]() | £13.99 |
| Wood Floor Risk Assessment | ![]() | ![]() | ![]() | £13.99 |
| Van Driving Risk Assessment | ![]() | ![]() | ![]() | £13.99 |



HS Direct LtdEst. 2004


