Login to the Safety First Package
  • 4,583 Safety First Package clients.
  • Use the menu on the left to find your industry
  • Can't see what you require? Call us on the number above
  • We can help with CHAS, Safe Contractor and EXOR Applications
  • Watch our company introduction video, click here!
x

Electrical Industry Safety Documents from HS Direct Ltd

HS Direct Ltd has written some example method statements and risk assessments specifically for the Electrical contracting industry. The list below allows you to purchase your health & safety documentation for tasks relevant to you. We know this is a long list, so call us on 0800 849 6728 and we will ensure you get the correct product for your task. All our method statements and risk assessments included things such as site safety, lock off and isolation procedures, and working at height where appropriate.

All our documents are delivered instantly through email and on your screen after you have paid. They come in microsoft word format, but don't worry if you do not have word, you can download a free alternative by clicking here or by contacting us on 0800 849 6728. All prices quoted are exclusive of VAT

Electrical Company and Contractors Health and Safety Policy

HS Direct Ltd has written an example health and safety policy. This document is a 57 page manual and consists of an extensive range of forms as well as your health and safety policy. Click the more info button below to get full details on what is included in your policy.

Just £39.95  Click for more details

Electricians Health & Safety Set

We have created a package for Electricians that includes a Risk Assessment, Method Statements, Health & Safety Policy and toolbox talks for Electrical Contractors. With 11 documents included in the package the price is discounted from our single document prices. Click more info for full details of what is included in the package.

Just £89.95   Click for more details
Electrical Method Statements - Call 0800 849 6728 for help selecting the correct documents
Network Cabling Method Statement Click for more details £13.99
Electrical Method Statement Click for more details £13.99
Air Conditioning Installation Method Statement Click for more details £13.99
Kitchen Re-fitting Method Statement Click for more details £13.99
Electrical (Move Main Board) Method Statement Click for more details £13.99
Aluminium Tower Scaffold Erection Method Statement Click for more details £13.99
Wind Turbine Method Statement Click for more details £13.99
Solar Roof Panel Method Statement Click for more details £13.99
PAT Testing Method Statement Click for more details £13.99
Emergency Lighting Method Statement Click for more details £13.99
Fire Alarm Fitting Method Statement Click for more details £13.99
Ground Source Heat Pump Method Statement Click for more details £13.99
PV (PhotoVoltaic) Cells Installation Method Statement Click for more details £13.99
Electrical First Fix Method Statement Click for more details £13.99
House Re-Wire Method Statement Click for more detailsAdded To Cart£13.99
Electrical Conduit Installation Method Statement Click for more details £13.99
Sliding Electric Gates Installation Method Statement Click for more details £13.99
Asbestos Removal Method Statement Click for more details £13.99
Carpet Cleaning Method Statement Click for more details £13.99
Brio Flooring Method Statement Click for more details £13.99
Laminate Flooring Method Statement Click for more details £13.99
Plywood Floor Method Statement Click for more details £13.99
Resilient Flooring Method Statement Click for more details £13.99
Safety Flooring Method Statement Click for more details £13.99
Sheet Vinyl Laying Method Statement Click for more details £13.99
Special Carpeting Method Statement Click for more details £13.99
Traditional Carpeting Method Statement Click for more details £13.99
Wood Floor Method Statement Click for more details £13.99
Electricians Risk Assessments - Call 0800 849 6728 for help selecting the correct documents
Electrical Fitting Risk Assessment Click for more details £13.99
Network Cabling Risk Assessment Click for more details £13.99
Air Conditioning Installation Risk Assessment Click for more details £13.99
Kitchen and Bathroom Refitting Risk Assessment Click for more details £13.99
Aluminium Tower Scaffold Erection Risk Assessment Click for more details £13.99
Wind Turbine Risk Assessment Click for more details £13.99
Solar Roof Panels Risk Assessment Click for more details £13.99
Sliding Electric Gates Installation Risk Assessment Click for more details £13.99
Asbestos Removal Risk Assessment Click for more details £13.99
Carpet Cleaning Risk Assessment Click for more details £13.99
Brio Flooring Risk Assessment Click for more details £13.99
Laminate Flooring Risk Assessment Click for more details £13.99
Plywood Floor Risk Assessment Click for more details £13.99
Resilient Flooring Risk Assessment Click for more details £13.99
Safety Flooring Risk Assessment Click for more details £13.99
Screeding Latex Risk Assessment Click for more details £13.99
Sheet Vinyl Laying Risk Assessment Click for more details £13.99
Special Carpeting Risk Assessment Click for more details £13.99
Traditional Carpeting Risk Assessment Click for more details £13.99
Wood Floor Risk Assessment Click for more details £13.99
Van Driving Risk Assessment Click for more details £13.99

Full method statement set!