COVID-19:
During this time please check out all of our available support resources here. 

Only £30.00 + VAT

Flooring Works Package Method Statement & Risk Assessment

In this set you will get a separate method statement and risk assessment for each of these tasks, allowing you to easily send the appropriate one to employees or contractors. The full set comes with full telephone support should you require it, including health and safety advice. If you would like to talk to someone before your purchase please do not hesitate to give us a call on 0114 244 4461

  • General Flooring
  • Brio Flooring
  • Safety Flooring
  • Wood Flooring
  • Plywood Flooring
  • Screeding
  • Special Carpeting
  • laminate Flooring
  • COSHH Assessment
  • And many more

These templates can easily be tailored to your exact job.

I don't have Microsoft Office or Microsoft Word, what should I do?

If you don't have Microsoft Office, or Microsoft Word installed on your PC or Mac, don't worry - you can still use our products. You can get a free alternative from Open Office.

Open Office Org is open-source developed alternative to Microsoft Office, developed by a large software company called Oracle. Open Source means the company who build the software, allow 100% use of it, 100% free.

Since Open Office is specifically developed to be exactly the same as Microsoft Office, with all the same programs in the suite (Eg: Word, Excel, Access and Power Point) - it will freely open any Microsoft Office file-format. Meaning, just because a document was written in Microsoft Word, doesn't mean it can't be opened in another program. Open Office will do that, and vise versa.

To download and install Open Office;

  1. Go to www.openoffice.org.
  2. On the left hand side, click 'I want to download Open Office'. In the green box, click the main link which starts with 'Start downloading OpenOffice.org...'
    • Windows Only:When the program has downloaded, click Install and wait for the program to install.
    • MAC OSX Only:When the program has downloaded, a notification box will pop up with an arrow from the Open Office Icon to the Applications Folder in Finder, drag the icon to the Applications folder to install the program.
  3. You are now ready to use Open Office, and the documents you have purchased from us.