My Basket

Quantity Subtotal Total  
Altro Floor COSHH Assessment 1 £2.99 £2.99
woocommerce-single-product
Buy this document for only

£2.99 + VAT

Download example Solar Roof Panel Installation Method Statement Template

Frequently Bought with this

We recommend the Solar Roof Panels Risk Assessment to go with that

It's just £2.99 Incl. VAT View Product
Method Statement Templates

Solar Roof Panel installation Method Statement

Example Method Statements are written by IOSH and NEBOSH qualified Safety Professionals, delivered instantly to your email address ready for you to download and start editing straight away.

The template should be changed to suit the exact works you are carrying out.

Method Statements are comprehensive, and are about 4-7 pages long, with space for your company details and logo. The lists below are not exhaustive but give you a good indication as to the information included in the Method Statement you are going to purchase.

We include telephone support with all of our documents, call us on the number above for assistance.

  • Site establishment (start of works)
  • Installation of solar panels to steel framework on roof of building
  • Installation of unvented hot water cylinders sited in plant room with associated pipe work
  • Commission, testing and handover