Electrical Industry Safety Documents from HS Direct Ltd
HS Direct Ltd has written some example method statements and risk assessments specifically for the Electrical contracting industry. The list below allows you to purchase your health & safety documentation for tasks relevant to you. We know this is a long list, so call us on 0800 849 6728 and we will ensure you get the correct product for your task. All our method statements and risk assessments included things such as site safety, lock off and isolation procedures, and working at height where appropriate.
All our documents are delivered instantly through email and on your screen after you have paid. They come in microsoft word format, but don't worry if you do not have word, you can download a free alternative by clicking here or by contacting us on 0800 849 6728. All prices quoted are exclusive of VAT
Employment Contracts
Did you know it was a legal requirement to provide all staff with an employment contract stating their employment terms? For Just £11.99 per contract we can supply a legally binding contract for persons in all classes of work, from Directors to Piece Workers. Click here to find out more.
| Electrical Method Statements - Call 0800 849 6728 for help selecting the correct documents | ||||
| Network Cabling Method Statement | ![]() | ![]() | ![]() | £8.99 |
| Electrical Method Statement | ![]() | ![]() | ![]() | £8.99 |
| Air Conditioning Installation Method Statement | ![]() | ![]() | ![]() | £8.99 |
| Kitchen Re-fitting Method Statement | ![]() | ![]() | ![]() | £8.99 |
| Electrical (Move Main Board) Method Statement | ![]() | ![]() | ![]() | £8.99 |
| Aluminium Tower Scaffold Erection Method Statement | ![]() | ![]() | ![]() | £8.99 |
| Wind Turbine Method Statement | ![]() | ![]() | ![]() | £8.99 |
| Solar Roof Panel Method Statement | ![]() | ![]() | ![]() | £8.99 |
| PAT Testing Method Statement | ![]() | ![]() | ![]() | £8.99 |
| Emergency Lighting Method Statement | ![]() | ![]() | ![]() | £8.99 |
| Fire Alarm Fitting Method Statement | ![]() | ![]() | ![]() | £8.99 |
| Ground Source Heat Pump Method Statement | ![]() | ![]() | ![]() | £8.99 |
| PV (PhotoVoltaic) Cells Installation Method Statement | ![]() | ![]() | ![]() | £8.99 |
| Electrical First Fix Method Statement | ![]() | ![]() | ![]() | £8.99 |
| House Re-Wire Method Statement | ![]() | ![]() | ![]() | £8.99 |
| Electrical Conduit Installation Method Statement | ![]() | ![]() | ![]() | £8.99 |
| Sliding Electric Gates Installation Method Statement | ![]() | ![]() | ![]() | £8.99 |
| Electricians Risk Assessments - Call 0800 849 6728 for help selecting the correct documents | ||||
| Electrical Fitting Risk Assessment | ![]() | ![]() | ![]() | £8.99 |
| Network Cabling Risk Assessment | ![]() | ![]() | ![]() | £8.99 |
| Air Conditioning Installation Risk Assessment | ![]() | ![]() | ![]() | £8.99 |
| Kitchen and Bathroom Refitting Risk Assessment | ![]() | ![]() | ![]() | £8.99 |
| Aluminium Tower Scaffold Erection Risk Assessment | ![]() | ![]() | ![]() | £8.99 |
| Wind Turbine Risk Assessment | ![]() | ![]() | ![]() | £8.99 |
| Solar Roof Panels Risk Assessment | ![]() | ![]() | ![]() | £8.99 |
| Sliding Electric Gates Installation Risk Assessment | ![]() | ![]() | ![]() | £8.99 |

HS Direct LtdEst. 2004


