Method statement templates
Fire and Fireplaces Installation Method Statement
£0.00 + VAT
Download example Gas Fire Installation Method Statement Template
Fire and Fireplaces Installation Method Statement
Example Method Statements are written by IOSH and NEBOSH qualified Safety Professionals, delivered instantly to your email address ready for you to download and start editing straight away.
The template should be changed to suit the exact works you are carrying out.
Method Statements are comprehensive, and are about 4-7 pages long, with space for your company details and logo. The lists below are not exhaustive but give you a good indication as to the information included in the Method Statement you are going to purchase.
We include telephone support with all of our documents, call us on the number above for assistance.
- Site establishment (start of works)
- Installation of granite hearths, back panels and limestone surrounds
- Installation of gas fires
- Making good and testing
- Finishing and handover
Is your business in need of method statements? Explore our extensive range of Method Statement Templates.

