Speak to an expert: 0114 244 4461
Sign in
Basket (1)

My Basket

Quantity Subtotal Total  
Altro Floor COSHH Assessment 1 £2.99 £2.99
Buy this document for only

£2.99 + VAT

Download example Solar thermal Servicing Method Statement Template

Method Statement Templates

Solar Thermal Remedial/ Maintenance Works Method Statement

Example Method Statements are written by IOSH and NEBOSH qualified Safety Professionals, delivered instantly to your email address ready for you to download and start editing straight away.

The template should be changed to suit the exact works you are carrying out.

Method Statements are comprehensive, and are about 4-7 pages long, with space for your company details and logo. The lists below are not exhaustive but give you a good indication as to the information included in the Method Statement you are going to purchase.

We include telephone support with all of our documents, call us on the number above for assistance.

  • Site establishment (start of works)
  • Repair/service of solar panels on roof of building
  • Repair and service of unvented hot water cylinders sited in plant room with associated pipework
  • Commission, testing and handover